The store will not work correctly when cookies are disabled.
- Home
- WBS15-1 Camden Espresso Shaker
WBS15-1 Camden Espresso Shaker
Single base waste basket hardware for a base cabinet 15" wide. Trash container is not included. See the product page for additional picture(s).
More Information | Width | 11 1/4" |
| Height | 17 1/2" |
| Depth | 21" |
|---|
Single base waste basket hardware for a base cabinet 15" wide. Trash container is not included. See the product page for additional picture(s).